Six drawings cover every French drain a house is likely to need: the trench in cross-section, the layout across a yard, the slope in profile, the two foundation versions, and the dry well and catch basin it is often confused with.
Short answer: A French drain diagram shows a fabric-lined trench about 14 inches wide and 22 inches deep, with 4 inches of washed stone under a 4-inch perforated pipe laid holes down, more stone above, and a continuous fall of at least 1 percent to an outlet lower than the trench.
On this page
Each drawing below is followed by what it shows and the dimensions that matter in it. The numbers are published minimums and typical ranges, with the source named. For the reasoning behind the system, start at the French drains hub.
Trench cross-section
This is a slice through a finished yard drain, looking along the trench. It shows four things: the trench cut into the soil, the filter fabric lining it, the stone filling it, and the perforated pipe near the bottom.
Read it from the bottom up, which is the order it is built. Fabric goes against the soil on the base and both walls. About 4 inches of clean washed stone goes on the fabric as bedding. The 4-inch pipe sits on the bedding with its perforations facing down. Stone fills in beside the pipe and continues 4 to 6 inches above it. The two sides of the fabric fold over the top of the stone, one lapped over the other, so the stone is enclosed. The top 9 inches or more is topsoil and sod, or more stone where water has to enter from the surface.
The dimensions that matter: a trench at least 14 inches wide and 22 inches deep, with the pipe 18 inches or more below ground (U.S. Department of Energy, Building America Solution Center). The guide to French drain pipe, gravel and fabric explains each material, and the French drain gravel calculator turns this cross-section into a stone order.
Yard layout in plan view
This drawing looks straight down on a lot. It shows the house, the wet area, the line of the drain and the outlet. A French drain layout is those four things in the right relationship: the drain starts at or just uphill of the wet ground and runs to a point that is lower than every part of the trench.
Three distances matter here. The first is the length of the run, because it sets the fall. At the 1 percent minimum, 50 feet of drain needs the outlet 6 inches lower than the start, and 100 feet needs 12 inches. The second is the length of solid pipe at the end. Perforated pipe belongs in the wet zone, and NRCS Conservation Practice Standard 606 calls for a rigid, unperforated outlet section at least 10 feet long for pipe 8 inches and smaller. The third is the distance from the house. The outlet should open onto ground that slopes away from the building, and the grade beside a foundation should itself fall at least 6 inches in the first 10 feet (International Residential Code, section R401.3).
The line also has to avoid a septic drain field, the root zone of mature trees and any path that sends the water onto a neighbor's property. The yard French drain guide covers lawn and yard drains in more detail.
Depth and slope profile
This is a side view along the length of the trench, with the ground surface on top and the pipe below it falling toward the outlet at 1 percent.
The fall is 1 foot per 100 feet of run, or about 1 inch every 8 feet. On level ground, a drain that starts 18 inches deep is 24 inches deep after 50 feet and 30 inches deep after 100 feet. On ground that slopes the same way as the drain, the trench can stay at one depth, because the surface supplies the fall.
Two points on the profile decide whether the design works. At the high end, the pipe must be below the water it is meant to catch, typically 18 to 24 inches for a lawn. At the low end, the pipe must still be above the place it empties. The line between them must be straight or steeper, never sagging. Any dip in the profile holds water after every storm and collects silt.
The depth and slope guide shows how to measure the fall with a level string and what to do when the lot does not have enough.
Exterior footing drain
This section cuts through a foundation wall from outside the house. It shows the wall, the footing under it, the drain pipe in stone beside the footing, and the backfill above. It is the yard drain's trench moved to the base of the foundation, where it intercepts groundwater before it reaches the wall.
The dimensions here come from the building code. The International Residential Code, section R405.1, puts the drain at or below the top of the footing. The stone extends at least 1 foot beyond the outside edge of the footing and at least 6 inches above its top, and it is covered with a filter membrane. The pipe rests on at least 2 inches of washed stone and has at least 6 inches of the same stone over it. Building America guidance adds that the pipe goes beside the footing, not on top of it, with the perforations down, and that a daylight outlet should discharge at least 10 feet from the foundation.
What the drawing cannot show is scale. Footing level is typically 4 to 8 feet down, which makes this the deepest and most expensive drain on the page at $60 to $120 per linear foot. The exterior foundation drain guide covers that job in full, including the wall waterproofing that is often renewed while the trench is open.
Interior basement drain
This section is drawn from inside the basement. It shows the edge of the floor slab where it meets the wall, a channel cut through the slab along that edge, the drain pipe in stone beside the footing, and the sump the pipe runs to.
The key difference from the exterior drawing is which side of the wall the pipe is on. An interior drain does not keep water away from the wall. It collects water that comes through the wall or up at the joint between wall and floor, and carries it under the slab to the sump pit, where a pump lifts it outside. The code allows this position: section R405.1 accepts a drain below the bottom of the slab.
The numbers that matter are lengths and levels. The pipe falls continuously toward the sump from the farthest corner. A basement perimeter is usually 100 to 160 linear feet, and the system costs $50 to $95 per linear foot plus $1,000 to $3,000 for the sump. Building America guidance has the pump discharge released at least 10 feet from the foundation.
The interior basement French drain guide covers the installation, and the foundation and basement water page helps confirm that seepage, not condensation or surface water, is the problem.
French drain, dry well and catch basin side by side
This drawing sets three devices next to each other because they are often confused. They do different jobs.
A French drain is a line. It collects water from the soil along its whole length and moves it somewhere else. A catch basin is a point. The Northern Virginia Soil and Water Conservation District describes it as a collection box with a slotted drain at the top and a drainage outlet at the bottom. It sits at a low spot, takes in surface water through the grate and sends it down a solid pipe. A dry well is a destination. It is a buried pit of clean stone that receives water and lets it soak into the ground.
The dimensions worth knowing are for the dry well. The Building America guide describes one 4 feet square and 4 to 6 feet deep, lined with filter fabric, filled with 3/4 to 1 1/2 inch clean rock, with the inlet pipe entering at half the height or higher and at least 8 inches of soil over the top. It should not sit next to the foundation, and the soil needs an infiltration test first. A dry well costs $1,500 to $4,000 installed.
The three combine more often than they compete: a catch basin or a French drain collects, and a dry well receives where there is no daylight outlet. The full comparison is on the page for French drain vs dry well vs catch basin.
Dimensions at a glance
| Dimension | Figure | Source |
|---|---|---|
| Yard trench | At least 14 in wide and 22 in deep | Building America Solution Center |
| Stone under the pipe, yard drain | 4 in | Building America Solution Center |
| Stone over the pipe, yard drain | 4 to 6 in | Building America Solution Center |
| Pipe | 4 in perforated, holes down | Building America Solution Center |
| Minimum slope | 1 percent, about 1 in per 8 ft | Same rate as IRC section P3005.3 for 3 in and larger drain pipe |
| Solid outlet section | At least 10 ft | NRCS Standard 606 |
| Stone at a footing | 1 ft beyond the footing edge, 6 in above its top | IRC section R405.1 |
| Stone under and over a footing drain pipe | At least 2 in under, 6 in over | IRC section R405.1 |
| Daylight or pump discharge at a foundation | At least 10 ft from the foundation | Building America Solution Center |
| Grade beside the house | Falls 6 in within the first 10 ft | IRC section R401.3 |
Local codes can be stricter than these figures. For any drain at a foundation, the building department's adopted code is the one that applies.
Sketch your own layout
A sketch of your own lot needs five things marked on it: the house, the wet area, the lowest point you can discharge to, the route between them, and everything buried along that route once the 811 marks are down.
Then add three numbers. Write the length of the run on the line. Write the drop in the ground between the two ends, measured with a level string. Write the depth of the trench at the start. If the drop is at least the starting depth plus 1 percent of the length, the drain reaches daylight. If it is not, the sketch needs a shorter route, a dry well or a pump. Where the water is roof runoff, a rain garden may take it before any drain is needed.
With the sketch done, the French drain installation guide takes it from paper to trench, and the French drain cost calculator prices the same length and outlet, with a form to request quotes if the job is one to hire out.
Common questions
What does a French drain look like in cross-section?
From the bottom up: filter fabric against the soil, about 4 inches of washed stone, a 4-inch perforated pipe with its holes facing down, 4 to 6 inches of stone over the pipe, the fabric folded closed over the stone, and 9 inches or more of topsoil or stone to the surface. The trench is about 14 inches wide and 22 inches deep.
What is the best layout for a French drain in a yard?
The shortest line from the wet area to a lower outlet that falls the whole way. Perforated pipe runs through the wet ground, and solid pipe carries the water from there to the discharge point. To block water coming from uphill, the line runs across the slope above the wet area instead of through it.
Where should a French drain end?
At a point lower than the whole trench, on ground that slopes away from the house and stays on your own lot. Federal Building America guidance puts a footing drain's daylight outlet at least 10 feet from the foundation. Where no lower ground exists, the drain ends at a dry well or a sump pump instead.
Does a French drain go inside or outside the footing?
Either. An exterior footing drain sits outside the foundation wall at footing level and intercepts groundwater before it reaches the wall. An interior drain sits under the basement slab beside the footing and collects water that gets through, then sends it to a sump. The building code accepts a drain at or below the top of the footing or below the bottom of the slab.
What is the difference between a French drain and a catch basin?
A French drain collects water from the soil along its whole length through stone and perforated pipe. A catch basin is a box with a grate on top and an outlet pipe at the bottom that takes in surface water at a single low spot. Many yards use both, with the basin feeding a solid pipe to the same outlet.